Allstate Construction Inc

Lodestone Park Phase II

Project Manager:Caleb Mendenhall, 801-616-6916, caleb@allstateconstruction.org
Superintendant: Archie Blackham, 801-706-4044 archie@allstateconstruction.org

Conformed Documents

Specifications

Drawings 1 of 6

Drawings 2 of 6

Drawings 3 of 6

Drawings 4 of 6

Drawings 5 of 6

Drawings 6 of 6

 


Proposal Requests

PR 01 Northeast Parking 

PR 02 Value Engineering 

PR 03 NE Parking Lot

PR 04 Water Meter


ASI's

‚ÄčASI 01 Fire Hydrant

ASI 02 Subgrade Testing

ASI 03 Additional Cut

ASI 04 Additional Path Layout

ASI 05 Farr Vista Drive Points

ASI 06 Mine Entrance

ASI 07 Additional Lay out Points

ASI 08 ASport Court Grades

ASI 09 Additional Playground Points

ASI 10 Additional Playground Layout Points


Sugarhouse  Monument Plaza

Project Manager: Brian Ebert, 801-563-3323, Brian@allstateconstruction.org

Superintendent: Tim Maynes, 801-706-403, Tim@allstateconstruction.org


Documents

Addenda

Addendum 01

Addendum 02

Addendum 03

Addendum 04

 


Specifications

Drawings

 


Airport Deicing Facilities

Project Manager: Caleb Mendenhall, 801-563-3323, caleb@allstateconstruction.org

Superintendent: Aaron Mendenhall, 801-867-9308, aaron@allstateconstruction.org


Conformed Documents

 

Specifications

Volume 1

Volume 2 

Volume 3

 


34 L Plans

Taxiway L Plans